Don't have an account? Sign up!
Amount of work offered to the system, defined by the product of the forecast and the AHT, measured in Erlang.
For example: If the forecast is 4/min and the AHT is 3 minutes, then the load is 4 x 3 = 12 Erlang.
» WFM Glossary
© 2021 CCmath. All Rights Reserved.