Don't have an account? Sign up!
Amount of work offered to the system, defined by the product of the forecast and the AHT, measured in Erlang. For example: if the forecast of the arrival rate is 4/min and the AHT is 3 minutes, then the load is 4 * 3 = 12 Erlang.
» WFM Glossary
© 2024 CCmath. All Rights Reserved.